top of page
TRANSPORTATION
LRT Line 3, Kayu Ara Station EuroZip® 25 Standing Seam for Roof and Euro Lok® 25 for Wall Cladding | MRT Line 2 Kuchai Lama Station Wall Claddings in EP900/19 Profile | Terminal 3, Changi Airport, Singapore |
---|---|---|
KLIA International Airport, Malaysia 90,000m2 high-build standing seam roofing system | AeroMall Senai Airport, Johor | Terengganu Drawbridge |
Sentul KTM Komuter Station, Kuala Lumpur | Air Traffic Control Tower VCR123, Malaysia Bi-modular insulated composite panels and glazing as the envelope cladding | Express Railway Link (ERL), Salak Tinggi, Malaysia. Highly versatile Eurozip Double Seam Lock System |
KLIA, Apron Control Tower (APVCR) | KLIA 2 (World Largest Low Cost Air Terminal) | Sibu Airport, Malaysia Eurozip 65 Standing Seam System |
KL Sentral Station Main Wave Hyperbolic & Parabolic Atrium Roof | Light Rapid Transit Line 3, Merchant Square Station Roofing System in EuroZip 25 Standing Seam System | KV LRT Line 3, Johan Setia Depo, Heavy & Light Maintenance Building Roofing System in EuroZip 38 Aluminium Standing, Aluminium Storm Proof Louvre System |
KV LRT 3, Johan Setia Depo, Stabling Yard Building KV LRT Line 3 Roofing System in EuroZip 38 Aluminium Standing, Aluminium Storm Proof Louvre System | Subang Subang Airport Complex A Roof Refurbishment for Hangars 2, 3 & 4; ECS & ECW Building | Subang Airport Complex A - Refurbishment of Roofing and Natural Ventilation System |
Ipoh Railway Station - Rawang to Ipoh Double Trancking Project |
bottom of page